Find Best Parallel Clamps, Heavy Duty Clamps, Parallel Beam Clamp on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > ABC Cable Fitting > Parallel Clamp > CAPG Copper Parallel Groove Clamp

CAPG Copper Parallel Groove Clamp

Basic Info

Model No.: CAPG parallel clamp

Product Description

CAPG Copper Parallel Groove Clamp

The connection of the best parallel clamp for the medium and small section of the aluminum stranded wire or the steel core aluminum stranded wire, The parallel groove clamp is suitalbe for unendure force splicing and branch on the aerial wire, being used with insulation cover. Parallel clamp are widely used. The jumper of the non-linear tower, the T-connection of the power system non-bearing connection, the branch line, the electrical equipment of the switch, the transformer, etc. The lightning conductor grounding down conductor and other connections can be completed by using the groove clamp.

MAIN DIMENSIONS ANS STANDARD PATICULARS
Item Specification Sort
CAPG-A1 CU 6-50² AL 16-70/12² Single Bolt
CAPG-A2 CU 10-95² AL 25-150² Single Bolt
CAPG-B1 CU 6-50² AL 16-70² Double Bolt
CAPG-B2 CU 10-95² AL 25-150² Double Bolt
CAPG-C1 CU 16-120² AL 16-120² Double Bolt
CAPG-C2 CU 50-240²AL 50-240² Double Bolt
CAPG-D CU 35-240²AL 35-300² Tri-Bolt
CAPG parallel clamp



CAPG parallel clamp

Our Services

1. Small Orders Accepted
2. Fast producing time, Prompt Delivery
3. International Approvals
4. Reply promptly in 24 hours
5. Best Price

FAQ:

1. Q: How about payment terms?
A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment can be negotiated.
2. Q: Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
3. Q: Are you a Manufacture Factory?
A: Yes. We are the direct manufacture factory, and our factory has specialized in porcelain insulator,composite insulator,glass insulator,arrester,cut out fuse, power fitting,etc.
4. Q: How long is producing time ?
A: Normally it will take about 30 days for production.
5. Q: What is the standard of package ?
A: For small capacity, we use carton, but for big capacity, we will use strong wooden case for protection or double inner packs in a master carton.
6. Q: How do you make sure your good quality ?
A: We use the best raw material , and every single product will go through a series of strict test.


insulator machineline post insulatorlong rod insulatorporcelain insulator machineporcelain insulatorpost insulator
We warmly welcome friends both domestic and abroad to visit our company, if you have any questions, please contact with us directly.

Contact us if you need more details on Best Parallel Clamps. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Heavy Duty Clamps、Parallel Beam Clamp. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : ABC Cable Fitting > Parallel Clamp